ALERT!
  • Advisory on Rooftop Solar Ph-II Scheme about cases of fraud. Click Here
  • As per the instruction from GUVNL, Officers of Sub-division and Division Office of DISCOMs shall remain present in the Office on every Monday (from 3:00 PM to 6:00 PM) and on every Thursday (from 11:00 AM to 2:00PM) particularly to resolve the queries under application process submitted under SURYA-Gujarat scheme and to do signature on required documents. If there is a holiday on above day, the next working day will be applicable for the above work
  • In order to disburse the subsidy timely, all empanelled agencies are requested to submit the original signed Claim Letter with supporting documents for the Portal generated approved subsidy claims to the concerned Division Office as soon as possible, if not submitted so far. Also, empanelled agencies are requested to resolve the query, if any, immediately
  • OM for Quota Enhancement dated 12 April 2021 Click Here
  • Guidelines for Online Pre-Dispatch Inspection Click Here
  • OM for Quota Enhancement Click Here
  • Press note for credit of surplus injection in case of Solar Rooftop PV Project Click Here
  • Provisional PPA Agreement Click Here, Time Extension Click Here, MNRE - Advisory on Rooftop Solar Scheme Click Here
  • Final- Amendment-Surya Gujarat implementation Guideline-2020-21 Click Here
  • Rooftop PV Installation, Vadodara, GJ
  • Rooftop PV Installation, J.M.Bhawan, Gandhinagar, GJ
  • The Sun at Tithal Beach, Valsad, GJ

15

Consumers Applied
Rooftop Solar

109.00

Capacity Applied (kW)

ROOFTOP SOLAR INSTALLATION ACTIVITIES

Consumer

  • Selection of vendor from the list of empanelled vendors
  • Submission of Solar Rooftop application in
  • Applying for Net Meter in DisCom
  • Payment of rooftop system instalment along with application and metering charges
  • Co-ordinate with vendor for system installation
  • Collect all the necessary documents from the installer
  • Signing Joint Inspection Report during plant commissioning

Installer

  • Coordinating and assisting consumer for application submission in portal
  • Feasibility analysis of Solar Rooftop in consumer roof
  • Installation of Solar Rooftop plant as per the DisCom specifications
  • Testing and commissioning of plant as per DisCom/ DisCom guidelines
  • Signing Joint Inspection Report after plant commissioning
  • Undertaking operation and maintenance of project for 5 years post commissioning

DisCom

  • Provide checklist of documents required for consumer application
  • Undertake technical feasibility of consumer application
  • Scrutinization of application documents Testing, the Solar Rooftop Project and ensuring compliance of grid
  • Interconnection approval and safety standards.
  • Signing Joint Inspection Report after plant commissioning